Factory Supplier PET Bottle Water Filling Capping And Labeling Machine

FOB Reference Price:Get Latest Price
US $5,666-89,999 / Sets | 1 Set/Sets PET Bottle Water Filling Capping And Labeling Machine (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Type:
Filling Machine
Condition:
New
Application:
Beverage
Packaging Type:
Bottles, Cans
Packaging Material:
Glass, Plastic
Automatic Grade:
Automatic
Driven Type:
Electric
Voltage:
220/380 V
Power:
4.5 KW
Place of Origin:
Jiangsu, China (Mainland)
Brand Name:
KINGMACHINE
Model Number:
CGF
Dimension(L*W*H):
2520*1890*2310mm
Weight:
3000kg
Certification:
CE ISO SGS
After-sales Service Provided:
Engineers available to service machinery overseas
Machine Name:
Factory Supplier PET Bottle Water Filling Capping And Labeling Machine
Machine Capacity:
1500-25000 BPH
Machine Material:
SUS 304
Machine Warranty:
12 Months
Machine Color:
Slivery
Machine Processing:
Washing Filling Capping For Bottles
Machine Function:
pet bottle water filling machine
Bottle Type:
Round or Square
Bottle Material:
PET Plastic
Bottle Volume:
200-2000 ML
SupplyAbility
SupplyAbility:
30 Set/Sets per Month PET Bottle Water Filling Capping And Labeling Machine
Packaging & Delivery
Packaging Details
Packing Type : Standard Exported Wooden Case For PET Bottle Water Filling Capping And Labeling Machine
Container : 1 container
Port
Shanghai Port
Lead Time :
30 days

Factory Supplier PET Bottle Water Filling Capping And Labeling Machine

Product Description

1. Product introductioon

 

This CGF Wash-filling-capping 3-in-1unit: Beverage Machinery is used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery. Beverage Machinery can finish all the process such as washing bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.pet bottle water filling machine

The Complete Bottled Mineral Water / Pure Water Production Line used in the beverage filling operations. The three functions of bottle wash, fill and seal are composed in one body of the machine. The whole process is automatic.

 

 

2. Washing heads 

 

•The rotary disk is fully made of SUS304 stainless steel. 

•Using company original tilting bottle clip, bottle clamp stuck bottleneck, avoid the traditional bottle on rubber clip to block the bottle thread parts may be caused by the pollution. Bottle clip is made of SUS304 stainless steel, health and durable.

•Using imported special efficient spray nozzle, the washing water will be sprayed in a particular angle, can wash any part of the inner wall, rinse with water thoroughly and save flush bottle.

•Bottle clamp and lifting mechanism of sliding sleeve adopts Germany Igus corrosion resistant bearing without maintenance.

•Washing part moves by a frame in the transmission system through the gear transmission.

 

 

3. Filling heads

 

•The washing bottle, filling, sealing are connecting with the thumbwheel card bottleneck transportation methods.

•The rotating disk is all made of SUS304 stainless.

•Filling method is gravity filling.

•Filling valve manufactured by SUS304.

•The filling valve structure design is reasonable, the filling quantity is accurate.

 

 

4. Capping heads

 

The capping machine is the highest precision in 3-in-1 unit machine, on the reliability of equipment operation, has enormous influence on the defective rate of the product.

Introduced the world's most advanced Italian AROL capping machine technology, combining with the filling machine production experience improvement, and ask college of Shanghai Jiaotong university mechanical engineering institute of electrical and mechanical design and automation technology of experts and professors to help design. 

 

 

5. Indside Sturcture

 

 

6. More models

 

Model

Washing heads

Filling heads

Capping heads

Weight

Overall dimension(mm)

CGF14-12-4

14

12

4

3200kg

2500*1880*2300mm

CGF16-16-5

16

16

5

4000kg

2600*1900*2300mm

CGF18-18-6

18

18

6

4500kg

2800*2150*2300mm

CGF24-24-8

24

24

8

6500kg

3100*2450*2300mm

CGF24-24-8

32

32

10

7500kg

3680*2800*2500mm

CGF24-24-8

40

40

12

8500kg

4100*2800*2300 mm

CGF24-24-8

50

50

12

9000kg

4500*3300*2350 mm

You can also customize the size you need

 

7. Product features


Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier. 

Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough.. 
The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution. 
High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose. 

Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains. 

Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan\'s Mitsubishi, France Schneider, Siemens.pet bottle water filling machine

 

 

Contact us
Company Information

1. Company introduction

Zhangjiagang King Machine Co.,Ltd is a direct manufacturer and exporter specializing in water treatment plants, beverage filling machine, packing machine, bottle blowing machine, injection   moulding machine and spare parts of filling line.

 

Our factory was established in the year of 1995, with the long history of accumulated experience in filling machine industry in south Jiangsu. There are many development engineer of filling machine in our company. We devote ourselves to the development, research and production of liquid food and beverage packing and filling industry.

 

King Machine cooperated with many customers in recent years, we win the trust of customers from our high-quality products. And we are looking forward to the future cooperation with you if our products can impress you deeply.

 

 

2. Factory inside

 

 

Our Services

1. Installation, debug

 

After equipments reached the workshop of customer, place the equipments according to plane layout we offered. We will arrange seasoned technician for equipments installation, debug and test production at the same time make the equipments reach the rated producing capacity of the line. Time for installation and debug is 15-25 days.

 

 

2. Training

 

Our company offer technology training to customer. The content of training is structure and maintenance of equipments, control and operation of equipments. Training is in the workshop of customer. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures producing capacity of the line. Time for installation and debug is 15-25 days.

 

 

 

3. Quality guarantee

 

We promise that our goods are all new and not used. They’re made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.

 

 

 

4. After sales

 

a. After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.

 

b. After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.

 


FAQ

Q1: Are you a trading company or a manufactory?

A1: We are a manufactory, we supply the factory price with good quality, welcome to visit !

 

Q2: What’s your guarantee or the warranty of the quality if we buy your machines?

A2: We offer you high quality machines with 1 year guarantee and supply life-long technical support.

 

Q3: When can I get my machine after I paid?

A3: The deliver time is based on the exact machine you confirmed. 

 

Q4: How can I install my machine when it arrives?

A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. pet bottle water filling machine

 

Q5: How about the spare parts?

A5: After we deal down all the things , we will offer you a spare parts list for your reference.

Related products

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like